01
Water studies
Needs analysis, feasibility study and sizing of the installations according to the characteristics of the project.
Water solutions built around your water need and the realities of the ground.
GEERS supports your water projects in the Democratic Republic of the Congo, from the feasibility study to the delivery of the installations.
We design solutions matched to your needs in catchment, drilling, pumping and water distribution, with reliability and durability as our guide.
Institutions, international organisations, companies and manufacturing partners.














A water project is not just about finding a source. You have to work out how to capture it, pump it, store it and carry it efficiently to the point of use.
GEERS analyses the characteristics of the site and the needs of the project to define a coherent, well-fitted water infrastructure.
Five services covering the whole chain, from studying the need to maintaining the works once delivered.
01
Needs analysis, feasibility study and sizing of the installations according to the characteristics of the project.
02
Design of solutions to tap and convey a water resource in a way suited to the site.
03
Delivery of drilling solutions matched to the needs of the project and the characteristics of the ground.
04
Sizing of the equipment needed to carry water efficiently from its source to its point of use.
05
Monitoring and maintenance of the installations to protect their operation and their durability.
Five stages that structure every water project, from the first survey to the monitoring of the installations in service.
Our goal is to turn your water need into a water solution that is reliable and matched to the conditions of the project.
Four steps, deadlines announced up front and a site that starts the moment you approve.
Analyse my water needYou tell us about your project by phone, on WhatsApp or at our offices.
Charged according to the terms agreed at first contact and to the nature of the visit: transport and the equipment needed to carry it out.
You receive the technical file and the quotation, including the sizing of the installation.
Work starts as soon as you approve the quotation and the schedule we present.
GEERS Shop
Hybrid inverters, automatic phase selectors and circuit breakers: everything you need to shield your pumping station from outages and voltage swings.
Answers to the questions our clients ask most often before getting started.
A 2.5 kW kit with 5 kWh of storage generally costs between $3,500 and $4,500, depending on your needs.
A system sized to your actual consumption.
The power rating is set after we assess your needs and inventory your equipment.
You get a system matched to your consumption.
We assess your equipment and its consumption before sizing your installation.
Your kit is built to measure for the way you use power.
Yes, the system is scalable and can be extended as your needs grow.
Your installation can grow with your needs.
Runtime depends on your consumption, but a properly sized system can deliver up to 16 hours of autonomy.
Stay powered for longer during outages.
The system uses a lithium battery with a minimum 10-year warranty.
Durable storage designed to last alongside your installation.
The solar panels carry a 25-year warranty.
An investment built to keep producing.
When GEERS handles the logistics, the equipment concerned is replaced under the applicable terms.
You stay supported even after the installation.
Whether you are a company, an organisation, an institution or a project owner, GEERS can study your need and define the right technical solution.