Engineering and energy solutions to build tomorrow’s DR Congo.

GEERS SARL supports companies, institutions, NGOs and private clients everywhere in the DRC with the design, installation and maintenance of energy solutions and electrical infrastructure.

GEERS technicians trained under the EYANO programme in Kinshasa GEERS technician surveying a site in Kinshasa GEERS team taking technical measurements in the field Electrical installation site run by GEERS GEERS teams working on an installation GEERS technical room: solar controllers, lithium battery and protection enclosure Solar panels installed on a roof by GEERS Photovoltaic array built by GEERS GEERS inverters and technical room GEERS photovoltaic installation under assembly

They trust us

Institutions, international organisations, companies and manufacturing partners.

  • UNICEF
  • Ministry of Budget of the Democratic Republic of the Congo
  • World Food Programme
  • Doctors Without Borders
  • Huawei
  • Victron Energy
  • Growatt
  • Felicity Solar
  • Dyness
  • Proton
  • Blue Carbon
  • Cabelec
  • Dev Solaire
  • Goshop

What we do

Three complementary trades, one technical standard: design, size, install and maintain infrastructure built to last.

Find my solution

GEERS Shop

The equipment we install, you can also buy

Panels, lithium batteries, inverters, circuit breakers and wiring accessories: the same equipment we use on site, in stock in Kinshasa and delivered upcountry.

Browse the catalogue Delivered in Kinshasa and upcountry

Our impact in numbers

Every installation delivered, every technician trained and every household connected widens access to reliable energy across the Democratic Republic of the Congo.

1 500+
Installations completed
500+
Employees
100+
Households supported
10+
NGOs supported
5+
Supply partners

Where we operate

GEERS SARL operates in every province of the Democratic Republic of the Congo, from Kinshasa to Katanga, making energy and water accessible everywhere.

Our projects

Ground-mounted plants, residential roofs, technical rooms and buildings: a look at the sites our teams have delivered across the DRC.

Start my project
Ground-mounted solar plant built on steel structures by GEERS GEERS technical room with Victron MultiPlus-II inverters and MPPT controllers
Ground-mounted photovoltaic array installed by GEERS upcountry Construction site supervised by GEERS teams
Distribution board and Victron inverters wired by GEERS Steel frame and cladding of a building assembled by GEERS
Modular construction and steel frame built by GEERS Residential roof fully covered with solar panels by GEERS
Harnessed GEERS technicians fitting solar panels on a Kinshasa rooftop GEERS technician supervising a building site

How we work

Four steps, deadlines announced up front and a site that starts the moment you approve.

Book an appointment
  1. Enquiry or briefing on your need

    You tell us about your project by phone, on WhatsApp or at our offices.

    Immediate
  2. On-site technical survey

    Charged according to the terms agreed at first contact and to the nature of the visit: transport and the equipment needed to carry it out.

    Within 24 h
  3. Full technical proposal

    You receive the technical file and the quotation, including the sizing of the installation.

    Within 24 h of the survey
  4. Installation

    Work starts as soon as you approve the quotation and the schedule we present.

    Immediately after approval

Why choose us?

Three commitments that separate an installation that lasts from one that has to be redone.

Expertise that keeps growing

Your projects are handled by teams trained regularly on new technologies and industry best practice.

6 months of follow-up included

You stay supported after the installation, with follow-up and a workmanship guarantee for 6 months.

Innovation that serves the result

You benefit from modern technology chosen to improve the performance and durability of your installations.

Our story

Born to put Congolese expertise at the service of the country

GEERS SARL was founded in May 2023 on one conviction: the skills needed to modernise Congolese infrastructure already exist in the DRC.

Its founders, young engineers trained in the universities and higher institutes of the country, built a company able to design, deliver and maintain electrical and energy infrastructure that meets international standards.

Read our story
The GEERS SARL team and its partners outside the Kinshasa head office

Frequently asked questions

Answers to the questions our clients ask most often before getting started.

A 2.5 kW kit with 5 kWh of storage generally costs between $3,500 and $4,500, depending on your needs.

A system sized to your actual consumption.

The power rating is set after we assess your needs and inventory your equipment.

You get a system matched to your consumption.

We assess your equipment and its consumption before sizing your installation.

Your kit is built to measure for the way you use power.

Yes, the system is scalable and can be extended as your needs grow.

Your installation can grow with your needs.

Runtime depends on your consumption, but a properly sized system can deliver up to 16 hours of autonomy.

Stay powered for longer during outages.

The system uses a lithium battery with a minimum 10-year warranty.

Durable storage designed to last alongside your installation.

The solar panels carry a 25-year warranty.

An investment built to keep producing.

When GEERS handles the logistics, the equipment concerned is replaced under the applicable terms.

You stay supported even after the installation.

Let’s talk about your project.

Tell us what you need: we arrange the technical survey within 24 hours and hand you a full technical proposal within the 24 hours that follow.

Our offices63, Avenue de Bangala, Kintambo, Kinshasa, DR Congo
Call Request a quote